Szczecin Teleyard started to built a new plant in KostrzynSłubice SEZ — Volkswagen Typ 2

16 Мар 2015 | Author: | Комментарии к записи Szczecin Teleyard started to built a new plant in KostrzynSłubice SEZ — Volkswagen Typ 2 отключены


Volkswagen Typ 2

Szczecin: Teleyard started to a new plant in Kostrzyn-Słubice SEZ

Szczecin’s neighbourhood, Skolwin, hosted the inauguration of the Teleyard investment in the subzone of the Kostrzyn-Słubice Special Zone.

The guests, who came in numbers, were warmly by the President of the Board of Teleskop Sp. z o. o. Maas in Polish, which met great applause. Thank you for understanding, loyalty, and help, to which we can meet in this today. I am very thankful to Olgierd Geblewicz for this – he said.

Christopher Maas, Member of the of Teleyard Sp. z o. o. presented the twelve-year of the company’s operation in Poland. belongs to the Belgian Telemond located in Antwerp. It operates plants in Kostrzyn nad Odrą it produces, among other telescopic cranes, container railway crane jibs, and for truck-mounted cranes.

During the the board of the company received Artur Malec, Chairman of the Special Economic Zone, a to conduct economic activities in zone.

Marshal Olgierd Geblewicz a difficult history concerning the investment.

— The primary assumed that the operations commence in the industrial shipyard Eventually, the company decided to in a new area in Szczecin, which was the of unexpected obstacles. In July we signed a letter of intent divided the duties between the the region, and the economic zone. All to be simple; however, had it not been for the of members of parliament Renata Magda Kochan, and Arkadiusz we would have not overcome the problems. First of all, I like to extend our thanks to the of the Teleskop company for believing in place and for your great in promoting Szczecin and West in gaining new investors.- said

Volkswagen Typ 2

Teleyard plans to start the of high-strength and highly-wear-resistant welded structures for the maritime sector and transport in Szczecin. At present, the operates in leased shipbuilding and employs about 90 people, welders, fitters and engineers, and components for lifting equipment for and Sarens, and sea dredger heads for

As part of the new investment, welding a paint shop, a social and car parks with an area of sqm. will be built in Street. About 300 people have been employed by the end of 2014. Ultimately, the investor to build other halls and worth EUR 20 million and employ a people by 2022.

— is the first venture in this of Szczecin within the economic The area, industrialised in the past, is challenges, and currently needs said President of Szczecin Krzystek.

The project in Szczecin involves building a training center for and cooperation with the Szczecin – the Westpomeranian University of Technology and the University.

To facilitate the implementation of ambitious plans, the project the necessary technical infrastructure in the areas in Stołczyńska Street is carried out as part of the Regional Programme of the Westpomeranian Region for the 2007-2013. The total cost of is PLN 9.5 million, PLN 4.7 million of which EU funding.

Volkswagen Typ 2
Volkswagen Typ 2
Volkswagen Typ 2
Volkswagen Typ 2
Volkswagen Typ 2

Interesting Articles



Смотрите также:
Tagged as:

Other articles of the category "Interesting":

Twitter-news
Our partners
Follow us
Contact us
Our contacts

dima911@gmail.com

Born in the USSR

About this site

For all questions about advertising, please contact listed on the site.


Volkswagen all cars catalog with specifications, pictures, ratings, reviews and discusssions about cars Volkswagen.